header graphic
Connect with Onondaga County Like Us On Facebook Follow Us On X (Twitter) Watch Us On Youtube
 
spacer
 
spacer

In 1967, the Lakeshore Sanitary District was created and began implementing its plan for a new wastewater treatment plant to replace three smaller treatment plants in the area -- Beechwood Farms, Harbour Village, and Oneida Park – consolidating wastewater treatment efforts. Beginning operation in 1974, the Brewerton Water Pollution Control Plant was designed with a series of pump stations that lead to two trunk sewers, Lakeshore and Orangeport. These trunk sewers are responsible for bringing wastewater from portions of the town of Cicero, Bridgeport, and the village of Brewerton to the plant. 

Facility Built in 1974 County Service primarily to Residential properties Treatment Type is an Advanced Secondary Process Flow Rate Averages at 1.9 mgd and reaches Capacilty at 3.0 mgd or millions of gallons per day Treated water outfalls to the Oneida River
The State Pollutant Discharge Elimination System (SPDES) permit for Brewerton has been extended under the provisions of the State Administrative Procedure Act (SAPA).
 
WEP Home Metro Syracuse location on Google Maps @OCDWEP on Facebook @OCDWEP on Twitter / X Send WEP a Message Onondaga County Home

 

 

To Provide Feedback About the Disability Accessibility of An Onondaga County Department's Website, Click Here to Access the Department's Contact Page

© 2001-  Onondaga County, New York  All Rights Reserved.   |  Ongov.net  |  Privacy Statement | Directions & Parking | Language or Disability Access Assistance