Miscellaneous Culvert and Channel Improvements
This project focuses on the Harbor Brook Drainage District, aiming to improve the drainage system with an engineering and planning study. The Harbor Brook drainage channels and culverts were originally installed in the early 1900s to manage flooding and sanitation issues. However, this over 100-year-old infrastructure is now showing signs of wear and tear. The study will include field investigations, hydrology and hydraulic modeling, condition reports, and planning documents for future improvements. It also covers the construction and repairs of various parts of the drainage system as identified in the study.
Velasko Road Dam Repairs & Improvements
The Velasko Road Detention Basin Dam serves as a Flood Control measure for the Harbor Brook Drainage District. Its purpose is to hold and gradually release high water flows while allowing normal and low flows to pass through without obstruction. During the bi-annual safety inspection of the dam, engineers identified areas requiring replacement or repair. This project aims to address these needs by funding immediate repairs highlighted in the inspection. Additionally, it will cover the engineering and construction costs for more extensive repairs identified as necessary. The goal is to ensure the dam continues to effectively manage floodwaters and maintain safety standards for the community. |