• Repair necessity was identified, Onondaga Creekwalk closed to the public during repairs.
• Over 500 feet of 42-inch Ley Creek force main replaced.
• Each 50-foot section of pipeline weighs approximately 5 tons (or 10,000 pounds)
• Replacement reduces likelihood of future breaks.
• Work completed in half the estimated time.
|