July 2004 progress
|
|
Roofs of the Chemical, BAF, and HRFS buildings, looking northwest
|
|
|
PVC piping being installed for the neat polymer and mixing-aging polymer tanks
|
|
|
Lamella tubes installed in the HRFS settling tanks to increase clarification capacity
|
|
|
Ferric chloride tanks and equipment tanks
|
|
|
|
|
SCADA room with cable tray installed under flooringfor control of processes
|
|
Installing floor supports in the control room
|
|
|
Stairs leading to the mechanical room in the Operations Center
|
|
|
Southeast corner of the construction area, now graded to the sub-base elevation
|
|
|
Initial construction of roads and parking lot, looking northeast from the UV building
|
|
|
Installing filter fabric for new roads on the southwest corner of the BAF
|
|