April 2004 progress
|
|
The new BAF facility (left) and the new Operations Building (right) take shape
|
|
|
Roads linking the new facilities are being installed. Here, the sub-base for a road on the west side of the BAF is being prepared.
|
|
|
Installing the forms for the concrete fillets in the HRFS settling tanks
|
|
|
Installing the built-up roof system on the Chemical Building
|
|
|
Brick veneer progresses along the south side of the Chemical Building
|
|
|
Installing stone ballast on the roof of the Operations Building
|
|
|
Installing the brick veneer along the north side of the Operations Building
|
|
|
Developing parking on the west side of the Sewer Maintenance Building
|
|
|
Installing a new electrical conduit for power to the Maintenance Building
|
|
|
Installing connectors for the fire protection water line
|
|
|
Preparing a ditch for the new water line
|
|
|
Drainage swale being installed along the north side of the new treatment facilities
|
|
|
|
Home |
Info
| M / WBE
| Projects
| New
| Links
| Contact
| Glossary
| Site map
Susan Miller, Project Deputy Director
Phone 315-435-2260 Fax 315-435-5023
Onondaga County Dept of Water Environment Protection
|
|