Go to home page
Go to home page

April 2004 progress

Ammonia treatment (biological aerated filtration, BAF)

The new BAF facility (left) and the new Operations Building (right) take shape
The new BAF facility (left) and the new Operations Building (right) take shape

Roads linking the new facilities are being installed. Here, the sub-base for a road on the west side of the BAF is being prepared.
Roads linking the new facilities are being installed. Here, the sub-base for a road on the west side of the BAF is being prepared.

HRFS facility (phosphorus treatment)

Installing the forms for the concrete fillets in the HRFS settling tanks
Installing the forms for the concrete fillets in the HRFS settling tanks

Chemical and Operations Building

Installing the built-up roof system on the Chemical Building
Installing the built-up roof system on the Chemical Building

Brick veneer progresses along the south side of the Chemical Building
Brick veneer progresses along the south side of the Chemical Building

Installing stone ballast on the roof of the Operations Building
Installing stone ballast on the roof of the Operations Building

Installing the brick veneer along the north side of the Operations Building
Installing the brick veneer along the north side of the Operations Building

Site work

Developing parking on the west side of the Sewer Maintenance Building
Developing parking on the west side of the Sewer Maintenance Building

Installing a new electrical conduit for power to the Maintenance Building
Installing a new electrical conduit for power to the Maintenance Building

Installing connectors for the fire protection water line
Installing connectors for the fire protection water line

Preparing a ditch for the new water line
Preparing a ditch for the new water line

Drainage swale being installed along the north side of the new treatment facilities
Drainage swale being installed along the north side of the new treatment facilities


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection