February 2004 progress

Ammonia treatment (biological aerated filtration, BAF)

Southern half of the BAF gallery
Southern half of the BAF gallery

Louvers being installed along the north side of the BAF facility
Louvers being installed along the north side of the BAF facility

Louvers being installed in BAF cell 18
Louvers being installed in BAF cell 18

Individual BAF cells removing ammonia from the influent wastewater
Individual BAF cells removing ammonia from the influent wastewater

The BAF influent channel supplies an average of 65 million gallons per day
The BAF influent channel supplies an average of 65 million gallons per day

 
The BAF electrical room   BAF backwash pumps

The BAF blower room.
The BAF blower room.

Phosphorus treatment (high-rate flocculated settling, HRFS)

Effluent piping and sand recirculating piping in the HRFS effluent gallery
Effluent piping and sand recirculating piping in the HRFS effluent gallery

Polymer feed line panel for HRFS tank 1
Polymer feed line panel for HRFS tank 1

Secondary effluent pump station

The completed pump station
The completed pump station

Operations building

Welding framing on the second floor of the operations building
Welding framing on the second floor of the operations building

Installing fireproof sheeting along the south side of the operations building
Installing fireproof sheeting along the south side of the operations building

Installing ferric chloride tanks in the chemical building
Installing ferric chloride tanks in the chemical building

Storm drainage

 
Storm line running toward manhole A9   Storm drain line

Installing a storm drain pipe
Installing a storm drain pipe


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection