February 2004 progress
|
|
Southern half of the BAF gallery
|
|
|
Louvers being installed along the north side of the BAF facility
|
|
|
Louvers being installed in BAF cell 18
|
|
|
Individual BAF cells removing ammonia from the influent wastewater
|
|
|
The BAF influent channel supplies an average of 65 million gallons per day
|
|
|
|
|
The BAF electrical room
|
|
BAF backwash pumps
|
|
|
The BAF blower room.
|
|
|
Effluent piping and sand recirculating piping in the HRFS effluent gallery
|
|
|
Polymer feed line panel for HRFS tank 1
|
|
|
The completed pump station
|
|
|
Welding framing on the second floor of the operations building
|
|
|
Installing fireproof sheeting along the south side of the operations building
|
|
|
Installing ferric chloride tanks in the chemical building
|
|
|
|
|
Storm line running toward manhole A9
|
|
Storm drain line
|
|
|
Installing a storm drain pipe
|
|
|
|
Home |
Info
| M / WBE
| Projects
| New
| Links
| Contact
| Glossary
| Site map
Susan Miller, Project Deputy Director
Phone 315-435-2260 Fax 315-435-5023
Onondaga County Dept of Water Environment Protection
|
|