January 2004 progress

Ammonia treatment (biological aerated filtration, BAF)

 
    BAF south gallery floor with final coating

Phosphorus treatment (high-rate flocculated settling, HRFS)

 
Sand recirculating pumps in the HRFS   Sand recirculating pumps and piping

 
Sludge transfer pumps in the effluent gallery   Effluent water pumps

Ultraviolet light disinfection

UV disinfection lights being readied for testing
UV disinfection lights being readied for testing

UV lights being lowered into discharge water stream for testing
UV lights being lowered into discharge water stream for testing

Operations building

Backfilling water lines
Backfilling water lines

Ductwork for heating and ventilation
Ductwork for heating and ventilation

84-inch bypass

Drop box with weir installed
Drop box with weir installed


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection