December 2003 progress

Ammonia treatment (biological aerated filtration, BAF)

 
Effluent flow into the BAF influent channel with one pump at 595 rpm   Effluent flow through the BAF cross gallery with one pump at 595 rpm

Cell 10 aerating
Cell 10 aerating

Cell 10 under full water conditions
Cell 10 under full water conditions

Alucabond panels being installed along west BAF
Alucabond panels being installed along west BAF

Piping inserted into cell hatch cover to fill with media (Nov 23)
Piping inserted into cell hatch cover to fill with media (Nov 23)

Phosphorus treatment (high-rate flocculated settling, HRFS)

Setting precase concrete plants for the HRFS facility
Setting precase concrete plants for the HRFS facility

Installing concrete blocks next to the Operations Building and HRFS south wall
Installing concrete blocks next to the Operations Building and HRFS south wall

Ultraviolet light disinfection

Setting up controls on the UV disinfection system
Setting up controls on the UV disinfection system

Effluent flows through the UV disinfection equipment (without UV lights installed)
Effluent flows through the UV disinfection equipment (without UV lights installed)


 
 Photos of the chemical and operations building, chemical storage, secondary effluent pump station, drainage and water lines


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection