December 2003 progress
|
|
|
|
Effluent flow into the BAF influent channel with one pump at 595 rpm
|
|
Effluent flow through the BAF cross gallery with one pump at 595 rpm
|
|
|
Cell 10 aerating
|
|
|
Cell 10 under full water conditions
|
|
|
Alucabond panels being installed along west BAF
|
|
|
Piping inserted into cell hatch cover to fill with media (Nov 23)
|
|
|
Setting precase concrete plants for the HRFS facility
|
|
|
Installing concrete blocks next to the Operations Building and HRFS south wall
|
|
|
Setting up controls on the UV disinfection system
|
|
|
Effluent flows through the UV disinfection equipment (without UV lights installed)
|
Photos of the chemical and operations building, chemical storage, secondary effluent pump station, drainage and water lines
|