November 2003 progress
|
|
Applying adhesive for waterproofing along the BAF cells next to the Chemical Building
|
|
|
|
|
Erecting scaffolding along the BAF building
|
|
Installing operators for the gates in the BAF cells (gates seen below)
|
|
|
Setting the motor for the settling tank of HRFS Tank 1 (Oct 30)
|
|
|
|
|
Precast concrete beams being installed over the HRFS
|
|
|
|
|
Setting the neat polymer tanks
|
|
|
Sludge transfer tanks
|
|
|
Working on the roof
|
Photos of the chemical and operations building, chemical storage, secondary effluent pump station, drainage and water lines
|