Metro construction: June 2003

Ammonia removal facilities (BAF)

Rebar is being installed for the North BAF influent channel.
Rebar is being installed for the North BAF influent channel.

Installing the concrete forms for the North BAF influent channel
Installing the concrete forms for the North BAF influent channel

Below the influent channel, the South BAF effluent channel
Below the influent channel, the South BAF effluent channel

Brick façade is installed along the west wall of the BAF
Brick façade is installed along the west wall of the BAF

Work on the upper stairwell of the BAF utility building
Work on the upper stairwell of the BAF utility building

Phosphorus removal facilities (HRFS)

Installing forms for the south wall of the upper cross gallery
Installing forms for the south wall of the upper cross gallery

Scaffolding for the HRFS effluent gallery
Scaffolding for the HRFS effluent gallery

Ultraviolet disinfection

Installing CMU for stairwell #2 at the ultraviolet disinfection facility
Installing CMU for stairwell #2 at the ultraviolet disinfection facility

Secondary effluent pump station (SEPS)

Pumps for the Secondary Effluent Pump Station
Pumps for the Secondary Effluent Pump Station

Conduit work in the electrical room of the SEPS
Conduit work in the electrical room of the SEPS


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection