Construction: May 2003
|
|
Installing the second layer of rebar for the influent channel of the South BAF
|
|
|
Upper gallery walls for the North BAF cells
|
|
|
The North BAF cells
|
|
|
Pouring concrete for the influent channel of the South BAF cells
|
|
|
South Gallery MEP lines
|
|
|
A worker prepares a BAF drop box for the next lift of concrete
|
|
|
Pneumatically operated butterfly valve actuators in BAF gallery
|
|
|
Cross gallery into the HRFS facility
|
|
|
Forming HRFS tank #1
|
|
|
Stripping the forms panels from HRFS tank #2
|
|
|
Upper interior portion of HRFS tank #3
|
|
|
CMU interior walls at the ultraviolet disinfection facility
|
See photos of secondary effluent pump station, chlorine contact tank, and utilities.
|