Highlights in February 2003
|
|
Placing concrete for the floor slab in the electrical-mechanical facility, Feb 5
|
|
|
|
|
Chemical gallery
|
|
Feb 5
|
|
|
|
|
Pouring concrete for the grade beams in the electrical room for the Secondary Effluent Pump Station (SEPS)
|
|
Backfilling the pump room of the SEPS (Feb 10)
|
|
|
|
|
Blower units for the BAF
|
|
Backwash pumps for the BAF (Feb 18)
|
|
|
First layer of reinforcing steel bars placed for SEPSawaiting concrete (Feb 18)
|
|
|
|
|
Backfilling earth between the SEPS grade beams
|
|
Expansion of electrical conduit for SEPS (Feb 18)
|
|
|
|
|
Tying down the rebar mat at the SEPS pump room
|
|
Installing the drain system at SEPS (Feb 20)\
|
|
|
|
|
Preparing haunches at the SEPS electrical room
|
|
Styrofoam forms cast in place for the new steam lines (Feb 20)
|
|
|
|
|
Pouring concrete for the slab at the SEPS pump room
|
|
Installing formwork for the extensions of the BAF cell wall (Feb 20-21)
|
|
|
|
|
Grouting the nozzle decks
|
|
February 21, 2003
|
|