84-inch tie-in to diversion structure — Fall 2002

Getting a piece of the pipe in place (Oct 8, 2002)
Getting a piece of the pipe in place (Oct 8, 2002)


 
Lowering the tie-in sleeve to the diversion structure (Oct 10, 2002)
Lowering the tie-in sleeve to the diversion structure (Oct 10, 2002)


 
Fitting up the last piece of the 84´´ outfall pipe (Oct 10, 2002)
Fitting up the last piece of the 84´´ outfall pipe (Oct 10, 2002)


 
The assembled outfall pipe (Oct 14, 2002)
The assembled outfall pipe (Oct 14, 2002)