UV facilities Fall 2002
|
|
Building the forms for the concrete slab that will support the UV reaction chamber (Oct 10, 2002)
|
|
|
Pouring mud for the UV reaction chamber (Oct 4)
|
|
|
Pouring concrete in the UV reaction chamber (Oct 11)
|
A Parshall flume is a specially shaped open-channel-flow
section that is installed in a channel to measure the
rate of flow.
|
|
Building the forms for the walls of the Parshall flume chamber (Oct 4)
|
|
|
Setting up the forms for part of the concrete slab for the Parshall flume (Oct 10)
|
|
|
Concrete has been poured for the UV disinfection junction. (Sept 30)
|
|
|
Working on the wall of the UV effluent box (Oct 1)
|
|
|
Backfilling the south chamber of the UV effluent facility (Oct 4)
|
|
|
The UV disinfection facility, looking north (Oct 17)
|
|