Go to home page
Go to home page

Natural gas line — Summer 2002

The main natural gas line feeding the Metropolitan Syracuse Wastewater Treatment Plant was replaced recently.
 
 
NiMo shuts off gas to the plant to permit installation of a new gas line.   A welder works on the new line.


 
 
The new gas line in the trench near Metro's garage   The trench is filled and repaved, and the new gas line is ready for operation.


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection