Go to home page
Go to home page

Conveyance route changes


 

Please note that following the information meetings held in September 2005, the proposed route for the conveyance pipeline was changed in two locations, as follows:

  • In the Upper Basin, the pipeline will be installed in the 200, 300, and 400 blocks of Hartson Street rather than in the 400-600 blocks of Rowland Street. This will shorten the amount of pipeline to be installed in this area, reduce the number of homes impacted during construction, and reduce project costs while still picking up the required overflow discharge points.
  • In the Lower Basin, the pipeline will no longer be installed in Eureka Street and behind homes on Waite Avenue. Instead, the pipeline will be installed in the street in the 900 block of Park Avenue and will cross West Genesee Street at State Fair Boulevard. This will reduce costs substantially while the total number of homes impacted during construction will be about the same as the previous plan.

See maps below for project area and pipeline routes.

Overall project

Click map to enlarge.
CSOs & proposed CSO abatement facilities in Harbor Brook project area
CSOs & proposed CSO abatement facilities in Harbor Brook project area

Lower Harbor Brook Basin

State Fair Boulevard and Park Avenue area
Click on maps for enlarged view.
Facility Plan alignment: Lower basin Alternative alignment: Lower basin

Upper Harbor Brook Basin

Grand Avenue area
Click on maps for enlarged view.
Facility Plan alignment: Upper basin Alternative alignment: Upper basin

Contact information

Additional information is available from:
 
Onondaga County Department of Water Environment Protection
650 Hiawatha Boulevard W.
Syracuse, NY 13204
 
Click here to email Sue Miller.

If you have questions, call Sue Miller at ext 367.


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection