Go to home page
Go to home page

Midland: November 2004

Partially removing Centro's storage barn to permit installation of sheeting for construction

Creek bank seeded for erosion control

Installing steel sheeting in the ground in preparation for replacing the 48-inch Main Interceptor Sewer (MIS)

54-inch HDPE piping arrives. It will replace the 48-inch MIS.

Relocating the 8-inch fire protection water line

—Photos by Joe Lorah


Home |  Info  | M / WBE  | Projects  | What's new?  | Links  | Contact  | Glossary
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection