Go to home page
Go to home page

Midland: July 2007

The south side of the Midland RTF, brick façade complete
The south side of the Midland RTF, brick façade complete

Electrical duct bank serving the Midland RTF
Electrical duct bank serving the Midland RTF

Painting in the chemical room
Painting in the chemical room

Odor control unit
Odor control unit

Channel for combined sewer overflows in the underground storage tank
Channel for combined sewer overflows in the underground storage tank

Inside the 144-inch convenance pipe
Inside the 144-inch convenance pipe

—Midland photos courtesy of Ken Jackson and Joe Lorah, C&S-CDM


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection