Midland: December 2006

Backfilling utilities along the 144-inch pipeline (Dec ’06) (Jan ’07, photo by American Aerial Scenes, Mark R. Parker, © C&S Engineers)
Backfilling utilities along the 144-inch pipeline (Dec ’06) (Jan ’07, photo by American Aerial Scenes, Mark R. Parker, © C&S Engineers)

Formwork for vacuum flushing chamber no. 1 at the RTF
Formwork for vacuum flushing chamber no. 1 at the RTF

The Midland RTF, looking north
The Midland RTF, looking north

Underground storage tank, emergency overflow
Underground storage tank, emergency overflow

—Midland photos courtesy of Ken Jackson and Joe Lorah, C&S-CDM