A crane lowers a segment of the 36-inch water line
|
|
|
Installing the 36-inch water line
|
|
|
Installing the pre-cast concrete roof over the underground storage tank
|
|
|
In preparation for blasting and excavation, blasting mats are placed along the route of the 144-inch pipeline
|
Photos courtesy of C&S Engineers
|