Midland: May 2005
|
|
Workers install a section of the 48-inch ductile iron pipe
|
|
|
Excavating for the disinfection tank, south side
|
|
|
Installing the mudmat in the disinfection tank
|
|
|
Concrete pumper is in place to pour the mudmat in the disinfection tank
|
|
|
Formwork and rebar in slab section 3 of the disinfection tank
|
|
|
Workers install rebar in the disinfection tank
|
|
|
Installing the first level of tiebacks on the east wall of the storage tank
|
|
|
|
|
Pouring concrete in slab #3 of the disinfection tank
|
|
Installing rebar for slab #2 in the disinfection tank
|
|
|
Installing the first level of tiebacks along the south wall of the storage tank
|
|
|
Carpenters install formwork for slab #2 of the disinfection tank
|
|
|
Excavating along the west wall of the storage tank
|
|
|
Excavating for the second level tieback system in the storage tank
|
Photos by Joe Lorah of C&S Engineers
|