Midland: February 2005

The two 16-inch HDPE pipes that replace the MIS during construction

Fabricating the 16-inch HDPE pipe for use in the bypass

Testing the braces on the side of the grit chamber

The bypass pumps, in use during replacement of the MIS

Excavation for the MIS—from Blaine Street to the grit chamber

 
Installing a dewatering well   Removing wastewater from the old MIS

 
Stone base in place for manhole   Manhole 11 set in place

A portion of the new 54-inch MIS, looking south

Installing siding on the new pole barn for Centro


Home |  Info  | M / WBE  | Projects  | What's new?  | Links  | Contact  | Glossary
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection