Midland: February 2005
|
|
The two 16-inch HDPE pipes that replace the MIS during construction
|
|
|
Fabricating the 16-inch HDPE pipe for use in the bypass
|
|
|
Testing the braces on the side of the grit chamber
|
|
|
The bypass pumps, in use during replacement of the MIS
|
|
|
Excavation for the MISfrom Blaine Street to the grit chamber
|
|
|
|
|
Installing a dewatering well
|
|
Removing wastewater from the old MIS
|
|
|
|
|
Stone base in place for manhole
|
|
Manhole 11 set in place
|
|
|
A portion of the new 54-inch MIS, looking south
|
|
|
Installing siding on the new pole barn for Centro
|
|