Midland: October 2004

Areas near the creek, that will be occupied by the underground storage tank, have been cleared and grubbed

 
Preparing the creek bank (looking toward Midland)   Creek bank with protection installed to mitigate erosion and sedimentation

Ductile iron pipe is stockpiled on the site

 
Installing test tie-back systems   Pile-driving equipment onsite

Removing the Oxford Street bridge