Clinton RTF & conveyances: January 2008
Past photos
|
|
|
|
Construction area, West Street
|
|
Pouring concrete for one of the three shafts
|
|
|
|
|
Dewatering work area, looking south
|
|
Pouring concrete
|
|
|
Workers in one of the three 36-ft shafts at the dewatering site
|
|
|
|
|
Installing steel sheeting near Clinton Street and Onondaga Creek
|
|
Section of steel sheeting ready to be placed
|
|
|
|
|
Shaft for microtunneling to place sewer line under Onondaga Creek (conveyance at bottom)
|
|
Worker in conveyance line
|
|
|
|
|
Shaft at ground level
|
|
Base of shaft
|
|
|
|
|
Auger flights, used for drilling under Onondaga Creek
|
|
Segments of conveyance line that will be placed under Onondaga Creek
|
|
|
|
|
Work site: Dickerson Street bridge near South Clinton Street
|
|
Groundwater discharge to Onondaga Creek from microtunneling work site
|
|
|
Removing soil and other materials excavated when the new conveyance lines were installed
|
|
|
Auger bit used to drill under Onondaga Creek
|
Photos by Bob Bellandi
|