Go to home page
Go to home page

Clinton RTF & conveyances: January 2008

 Past photos

Phase I conveyance sewer

Dewatering

 
Construction area, West Street   Pouring concrete for one of the three shafts

 
Dewatering work area, looking south   Pouring concrete

Workers in one of the three 36-ft shafts at the dewatering site
Workers in one of the three 36-ft shafts at the dewatering site

Onondaga Creek crossing

 
Installing steel sheeting near Clinton Street and Onondaga Creek   Section of steel sheeting ready to be placed

 
Shaft for microtunneling to place sewer line under Onondaga Creek (conveyance at bottom)   Worker in conveyance line

 
Shaft at ground level   Base of shaft

 
Auger flights, used for drilling under Onondaga Creek   Segments of conveyance line that will be placed under Onondaga Creek

 
Work site: Dickerson Street bridge near South Clinton Street   Groundwater discharge to Onondaga Creek from microtunneling work site

Removing soil and other materials excavated when the new conveyance lines were installed
Removing soil and other materials excavated when the new conveyance lines were installed

Auger bit used to drill under Onondaga Creek
Auger bit used to drill under Onondaga Creek

—Photos by Bob Bellandi


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection