Harbor Brook CSO Abatement Project Facility Plan (Aug 2005)
by Brown and Caldwell for Onondaga County Dept of Water Environment Protection
Harbor Brook CSO Abatement Project Facility Plan (Aug 2005)
Onondaga County entered into an Amended Consent Judgment (ACJ) in 1998 that
requires it to eliminate or capture for treatment at
least 85% by volume of the combined sewage collected
in the combined sewer system during precipitation
events, eliminate or minimize floating substances in
Onondaga Lake attributed to the County's CSOs, and achieve
water quality standards for bacteria for all portions
of Onondaga Lake that are Class B.
The ACJ listed the Harbor Brook In-Water System (HB
IWS) as an Interim CSO Project. The purpose of this
facilities plan is to compare the HB IWS to
alternatives for abatement of CSOs in the Harbor Brook
basin, including regional facilities and sewer
separation. The comparison is based on engineering and
operational considerations, environmental and
community effects, and cost-effectiveness.
This report has the following sections:
Executive summary
1. Basis for CSO Abatement
2. Harbor Brook In-Water System
3. Technology Evaluation
4. Siting Analysis
5. Sewer Separation
6. Alternatives Analysis
7. Scenarios
8. Recommended Plan
9. Project Implementation Schedule
Appendices
In addition, an
Environmental Information Document
has been written to address the Harbor Brook project.
|