Clinton Street CSO Abatement Project Facility Plan (Nov 2005)
by Environmental Engineering Associates, LLP for Onondaga County Department of Water Environment Protection
Appendices
A. Bacterial model update for Onondaga Lake
B. Pages 7 and 8 of ACJ Appendix BClinton CSO Project Description
C. Summary listing of vortex separator installations in the U.S. and Canada
D. Summary listing of overflow retention facilities (used for CSO treatment)
E. One-year design storm individual CSO flow hydrographs
F. Meeting minutes, meeting with City of Syracuse representatives concerning sewer separation
G. Memorandum: MIS flow capacity evaluation
Appendix H. Correspondence: Design flow rate & flow volume info for CSO abatement alternatives: Email Susan Miller, Project Deputy Director or phone 315-435-2260 for copy.
I. Memorandum: Review of sewer separation costs
|