Go to home page
Go to home page

Midland Ave Regional Treatment Facility & Conveyances—Facility Plan, Jan 2003
by Environmental Engineering Associates, LLP
for Onondaga County Department of Water Environment Protection

Appendices

    A. Memorandum, Sewer Separation Evaluation*
B. Memorandum, Recommended Sewer Separation Unit Costs
    C. Memorandum, Midland RTF Swirl Design Hydraulic Evaluations*
D. Memorandum, CSO Closure Evaluation
    E. Memorandum, RTF Hydraulic Evaluation*
       Table 4a. CSO volume capture table—Existing conditions
       Table 4b. CSO volume capture table—Future conditions
       Table 4c. CSO volume capture table—Future conditions
    F. Memorandum, Midland RTF Size Evaluations*
G. Memorandum, Newell Street CSO Abatement Evaluation
       Table 1. Present worth analysis
H. Preliminary RTF Basis of Design
____________
* Not available online. Please click here to request a paper copy. Thank you.


Home |  Info  | M / WBE  | Projects  | New  | Links  | Contact  | Glossary  | Site map
 
Susan Miller, Project Deputy Director
Phone 315-435-2260   Fax 315-435-5023
 Onondaga County Dept of Water Environment Protection